Products

Hydraulic Hose Assemblies

RHPL manufactures hydraulic hose assemblies in Raipur for Caterpillar, Komatsu, JCB and other mining and industrial equipment. Normal dispatch is 4–6 days. Send your part number or old hose-tag photo on WhatsApp +91 88717 39555.

Hydraulic hose assemblies

Manufactured in Raipur, India · Customers include Vedanta, UltraTech, Adani, NMDC and NTPC → Clients & Performance · Authorised Gates Distributor · Certificates & Approvals →

Hydraulic Hose Kits

Browse All 8,119 Hose Assembly References

Browse Hose Assembly References by Brand

Browse 2 Families and Categories
Specify with Confidence

Choose The Right Assembly Enquiry Route

Four ways to start, depending on what you have in hand: a hose tag or OEM number, a drawing or sample, a machine due for maintenance, or a supplier evaluation.

Hose Assembly Process and Quality Checks

RHPL’s hose assembly process includes controlled cutting, Finn-Power crimping, dimensional inspection and pressure testing. Traceability tags identify the assemblies, and cleaning is completed before packing. RHPL is ISO 9001:2015 certified.

Impulse tests have been carried out at Semperit’s lab and Eaton’s fluid lab in Pune. Visit Quality and Testing to review the reports and their tested scope.

Start a material enquiry with the Gates hydraulic hose catalogue, or read about RHPL’s in-house fitting manufacture. For machine replacement requirements, browse hydraulic hose kits and send the references and quantities through the quotation enquiry form. Normal dispatch is 4–6 days; freight is extra.

Replace An Identified Assembly

Have a hose tag or OEM reference? Send the full reference and quantity, plus the machine or installation identity. Use the part-number directory to find published references; RHPL confirms the proposed replacement before supply.

Specify A Custom Assembly

Have a drawing, sample or changed installation? Use the custom-assembly page to prepare the manufacturing reference. Identify any changes instead of treating the old assembly as an unchanged specification.

Plan A Machine Kit

Replacing several hoses during maintenance? Use the machine-kit directory and state whether the job covers selected replacements, circuit groups or the complete agreed machine scope.

Review How RHPL Manufactures

The manufacturing page explains preparation, assembly, inspection and identification. The manufacturer-in-India page brings together Raipur works details and evidence for vendor evaluation.

Select the Assembly Type

A hydraulic hose assembly is a finished hose and connection combination prepared for an accepted application. Begin by distinguishing an individual replacement from a custom assembly or a machine-wise kit. Braided and spiral hose constructions belong to different manufacturer product families; the family name alone is not a completed assembly specification. RHPL reviews the exact hose, compatible fittings and application privately. If you need bare hose supplied in Meter, use the hose catalogue rather than assuming that a finished assembly and a coil of hose are the same item.

Read SAE, EN and ISO References Correctly

Manufacturer catalogues identify standards against particular hose families and sizes. Examples include SAE 100R references, EN 853 or EN 857 descriptions, and ISO hydraulic hose standards. Read the exact product entry and its applicable edition with the manufacturer documentation. A standard printed against a hose does not certify every RHPL assembly or establish a machine-specific replacement. Ask which standard and inspection documents apply to the actual offered configuration. We confirm order-specific requirements in the quotation instead of applying one performance claim across the catalogue.

Preparation and Crimping

The manufacturing route begins with the accepted reference, drawing or sample and a reviewed hose-and-fitting combination. Preparation, insertion and crimping follow the applicable system instructions and tooling requirements. Matching thread appearance or nominal size is not sufficient to approve a combination. The team checks the agreed configuration and identifies the assembly for the order. Where a previous assembly has been modified, state the change clearly so the manufacturing reference is reviewed instead of copied without checking. The manufacturing and quality pages explain the available process evidence.

Testing and Order Evidence

Specify required inspection records when requesting a quotation. RHPL’s quality page describes pressure-testing controls and separately documents impulse-test evidence for selected configurations. Those tests have different purposes; a result for one configuration is not a universal claim for every listed reference. Review the published scope and ask which records accompany your order. Certificates are presented as cards on the website; document requests go through RHPL review. No published catalogue page discloses the private assembly parameters or a complete machine parts list.

Plan Maintenance and Receiving

For mining, HEMM and industrial maintenance enquiries, explain whether the purchase is an urgent replacement, planned shutdown requirement or spare for later use. Preserve machine identity and separate different units in the private enquiry. Send the reference, quantity, destination and required date, and state any item-tagging or packing needs. Normal-order dispatch is 4–6 days, confirmed for the accepted requirement; freight is extra. Check the quoted scope and receiving identification before installation. Contact RHPL on WhatsApp +91 88717 39555 when you need help preparing the enquiry.

Documented Complete-Kit Installation

This documented KOBELCO SK380-8 installation shows RHPL’s field work. It does not establish fitment for another machine, serial range or variant.

Part-Number Listings

8,119 matching items

Page 1 of 339

Page 1 of 339

Questions Before You Enquire

Can I Start With A Hose Reference?

Yes. Send the full reference and quantity with the application, destination and required date. RHPL will request any missing information before confirming the offered assembly.

Does A Catalogue Reference Guarantee Fitment?

No. Machine variants, installation changes and service requirements still need review. RHPL supplies independent aftermarket replacements; OEM references identify the application.

How Are RHPL Hose Assemblies Prepared And Checked?

The process includes controlled cutting, Finn-Power crimping, dimensional inspection, pressure testing, traceability tags and cleaning before packing.

Where Can I Review Impulse-Test Reports?

The quality page presents reports for impulse tests at Semperit’s lab and Eaton’s fluid lab in Pune. Review the individual reports for their tested scope.

What Is The Normal Dispatch Time?

Normal dispatch is 4–6 days. Freight is extra.

Send the references. We will review the requirement.

One part, a complete kit or a list from Excel—all in one enquiry.

Send Your Part List