Raipur Hydraulics

Quality Controls & Impulse Testing

RHPL manufactures hose assemblies for mining and industry under an ISO 9001:2015 quality-management system in Raipur. Explore our assembly inspection process and the documented impulse tests for selected configurations.

ISO 9001:2015 — Raipur Hydraulics Private Limited
SUPPLIED CERTIFICATE

ISO 9001:2015

Quality management system

Issuer:
QRO Certification LLP
Reference:
305025120307Q
Issued / effective:
3 December 2025
Stated expiry:
2 December 2028

Manufacturing and supply of hose assemblies, hydraulic pipe fittings, automotive components and connectors for hydraulic, pneumatic and industrial applications.

The certificate states a scope of ¼–8 inch I.D. and 50–10,000 PSI. These scope limits are not ratings for every product. Validity is subject to successful annual surveillance; scheduled dates are 2 December 2026 and 2 December 2027.

Copy Available On Request → Copies are shared with verified buyers after RHPL review.

All Certificates & Approvals →

How Does RHPL Check Hose Assemblies?

RHPL's hose assembly process combines controlled hose cutting, cleaning, Finn-Power crimping, dimensional inspection, pressure testing and traceability tags. These activities connect preparation, assembly and identification before packing. Our ISO 9001:2015 certification supports the quality-management framework for this work at our factory in Raipur, Chhattisgarh.

  1. Cutting: Controlled hose cutting.
  2. Cleaning: Hose cleaning, including cleaning before packing.
  3. Crimping: Assembly using Finn-Power crimping.
  4. Dimensional inspection: Checking assembly dimensions.
  5. Pressure testing: Testing hose assemblies.
  6. Traceability: Applying traceability tags for identification.
Illustrative view of a hydraulic hose proof pressure test bench with protective enclosure.

What Quality Controls Support In-House Fitting Production?

RHPL produces fittings in-house from EN1A and MS1018 steel, with bar cutting, CNC or lathe operations, bending where needed, electroplating and final quality control. This fitting production route complements our hose assembly activities, which include dimensional inspection, pressure testing, traceability tags and cleaning before packing.

Documented Assembly Testing · 2020–2021

Hose Assembly Impulse Testing

RHPL maintains documented impulse-test results for selected hose assembly configurations. Reports from Semperflex and Eaton identify RHPL's role in fitting production or hose assembly and record successful results for every sample tested.

26 samples across 6 reports — all recorded as OK or completed successfully.

Semperflex (Semperit Group)

Semperflex (Semperit Group) tested assemblies built with RHPL-produced fittings under EN ISO 6803. All samples in the three reports reached the recorded cycle count with an OK result.

The reports name Raipur Hydraulics Private Limited as the customer and fitting producer. The stated reason for testing is customer test.

Semperflex — Archived Impulse-Test Results
ReportTest StartMethod StatedHose ConstructionSamplesRecorded CyclesResult
SAC 277/2020 10 Nov 2020 EN ISO 6803 2-wire braided 6 250,000 OK (all samples)
SFX 141/2020 14 Dec 2020 EN ISO 6803 Spiral-reinforced 3 500,000 OK (all samples)
SFX 142/2020 2 Feb 2021 EN ISO 6803 Spiral-reinforced 2 603,153 OK (all samples)

Eaton Hydraulics

Eaton Hydraulics, Pune — now part of Danfoss Power Solutions — tested Eaton hoses and Eaton fittings assembled by RHPL under SAE J343. All three certificates record successful completion.

The certificates identify RHPL as the hose assembler or hose assembly manufacturer. Testing took place at Eaton Hydraulics, Magarpatta, Pune.

Eaton Hydraulics — Archived Impulse-Test Results
ReportYearMethod StatedHose ConstructionSamplesRecorded CyclesResult
TR-036969A 2020 SAE J343 6-spiral 3 500,000 Completed successfully
TR-037030A 2020 SAE J343 2-wire braided 6 200,000 Completed successfully
TR-037324A 2020 SAE J343 4-spiral 6 500,000 Completed successfully

Report copies are shared after RHPL review.

Send the references. We will review the requirement.

One part, a complete kit or a list from Excel—all in one enquiry.

Send Your Part List