HOSES & FITTINGS · DANFOSS
Danfoss EC512
Compare the listed sizes and technical specifications for EC512. Select the exact reference for your enquiry.

Part-number listings
10 matching references
| Part number | Family | Inside diameter (mm) | Inside diameter (in) | Outside diameter (mm) | Outside diameter (in) | Working pressure (bar) | Working pressure (psi) | Minimum bend radius (mm) | Minimum bend radius (in) | Burst pressure (bar) | Burst pressure (psi) | Weight (kg/m) | Weight (lb/ft) | UOM | Details |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EC512-12L | EC512 | 19.0 | 0.75 | 33.0 | 1.3 | 420 | 6100 | 280 | 11.02 | — | — | — | — | Meter | View details |
| EC512-16L | EC512 | 25.4 | 1 | 39.9 | 1.57 | 380 | 5500 | 340 | 13.39 | — | — | — | — | Meter | View details |
| EC512-20L | EC512 | 31.8 | 1.25 | 47.1 | 1.85 | 350 | 5100 | 460 | 18.11 | — | — | — | — | Meter | View details |
| EC512-24L | EC512 | 38.1 | 1.5 | 55.1 | 2.16 | 290 | 4200 | 560 | 22.05 | — | — | — | — | Meter | View details |
| EC512-32L | EC512 | 50.8 | 2 | 69.7 | 2.74 | 250 | 3650 | 700 | 27.56 | — | — | — | — | Meter | View details |
| EC512-12 | EC512 | 19 | 0.75 | 33.0 | 1.30 | 420 | 6100 | 280 | 11.02 | 1680 | 24400 | 1.47 | 0.99 | Meter | View details |
| EC512-16 | EC512 | 25.4 | 1.00 | 39.9 | 1.57 | 380 | 5500 | 340 | 13.39 | 1520 | 22000 | 2.04 | 1.37 | Meter | View details |
| EC512-20 | EC512 | 31.8 | 1.25 | 47.1 | 1.85 | 350 | 5100 | 460 | 18.11 | 1400 | 20400 | 2.39 | 1.61 | Meter | View details |
| EC512-24 | EC512 | — | — | 55.1 | 2.17 | 290 | 4200 | 560 | 22.05 | 1160 | 16800 | 3.19 | 2.14 | Meter | View details |
| EC512-32 | EC512 | 50.8 | 2.00 | 69.7 | 2.74 | 250 | 3650 | 700 | 27.56 | 1000 | 14600 | 4.37 | 2.94 | Meter | View details |
Selection and supply
Confirm the current manufacturer specification, fluid compatibility, operating conditions and approved hose/coupling combination before ordering. Hose working pressure does not independently establish the finished assembly rating.
Typical delivery is 4–6 days for normal orders; the quotation confirms the product, quantity and schedule.
