Drilling Rigs hose kits
Drilling-rig hose requirements should distinguish the functions being maintained, such as mast-related movement, feed, rotation or auxiliary hydraulic services where applicable. The buyer's machine documents determine which groups belong in the order; this chapter does not assert a universal drilling-rig bill of materials. Open-mine and quarry drilling operations often need maintenance packages arranged around a particular intervention rather than a loosely described set of spares. Identify the affected groups, equipment designation and any installation changes before asking for pricing. Several recorded names here require nameplate confirmation, and their pages carry that notice. RHPL reviews the supplied references and clarifies the assembly specification before manufacture. Reference tags, circuit grouping and a packing list help connect the resulting supply to the accepted work scope. They also give stores and workshop personnel a common receiving record before the equipment is released for maintenance. Start with the recorded model below, then provide the serial number, hour-meter reading, hose-tag photographs, required quantities and destination. Allow 4–6 weeks for normal orders; freight and final scheduling are confirmed in the quotation.

Epiroc
Sandvik
Recorded designations — confirm the nameplate
D50
Drill Rig
Designation as recordedEpirocIBH10
Drill Rig
Designation as recordedEpirocICM260
Drill Rig
Designation as recordedEpirocIDM30
Drill Rig
Designation as recordedEpirocIDM45
Drill Rig
Designation as recordedEpirocIDM70
Drill Rig
Designation as recordedRECPRECP650
Drill Rig
Designation as recordedRECPRECP750
Drill Rig
Designation as recordedSandvikTITAN150
Drill Rig
Designation as recorded